Barrambie Way New Pressure Main & M&E Upgrade
Home / Projects

Barrambie Way New Pressure Main & M&E Upgrade

Civcon's largest project to date: 14.2km of new wastewater pressure main and a major pump station upgrade at Barrambie Way for the Water Corporation.

Client
Water Corporation
Location
Ellenbrook WA
Status
Completed 2026
The project

Project overview

Civcon has been engaged by the Water Corporation to install a new wastewater pressure main and undertake upgrade works at the Barrambie Way Wastewater Pump Station (WWPS) to support continued growth within the City of Swan and City of Wanneroo. The project involves the installation of 14.2km of wastewater pipeline, made up of 6 km of single pipeline and 8.2 km of dual wastewater pipeline, along with mechanical and electrical upgrades at the Barrambie Way WWPS. The upgrades will increase the pump station’s capacity from 158 L/s to between 270 and 360 L/s to meet the growing demand.

Barrambie Way New Pressure Main & M&E Upgrade
Scope of works

Scope of works

  • Bulk earthworks, excavation and ground shaping
  • Controlled fill placement and compaction
  • Construction of working platforms for temporary and permanent works
  • Management and treatment of unsuitable materials (including acid sulphate soils)
  • Dewatering and ground stabilisation in variable ground conditions
  • Road reserve reinstatement in accordance with MRWA and LGA requirements
  • Excavation, trenching, backfilling, compaction, and site restoration
  • Supply and installation of approximately 14.2 km of HDPE pipelines and associated valves and fittings, including 5.1 km of DN900PE pipeline and 9.1 km of DN630PE dual pipeline
  • Removal and disposal of existing DN150 PE reticulation main (approx. 730m)
  • Construction of six section valve stations which includes 28 x automated DN600 gate valves
  • Pipeline pressure testing
  • Mechanical, civil, structural, instrumentation and control (I&C), SCADA, and electrical works associated with the pressure main connecting Barrambie Way WWPS to the Gnangara Branch Sewer
  • Mechanical and electrical upgrades at Barrambie Way WWPS to accommodate increased flow rates
  • Installation of the HV substation
  • Relocation and installation of additional dry well pumps
  • Full bypass pipeline to allow for the pump station to remain operational while works continue
  • Major micro-tunnelling works at Gnangara Road, Mirrabooka Avenue and Hartman Drive, with GRP jacking pipe drilled beneath major trunk mains and HV services
Start your project

Building something like this?

Send the scope and we'll come back with the right team, the right methodology and a straight answer on program and price.

Call the office08 6500 1388
Head office

Ground Floor, 91 Havelock Street
West Perth WA 6005

Call 6500 1388Start your project
×
Capability statement

The full Civcon capability, in your inbox

Get the Civcon capability statement: our civil construction, utility infrastructure and project management credentials, ready for your next tender or project.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

By sending, you agree to our privacy policy. No spam, ever.