Land clearing and site preparation, bulk earthworks and lot grading, limestone and concrete retaining walls, road construction, kerbing and asphalt, stormwater drainage and soakwells, water and sewer reticulation, common trench power, gas and communications, then footpaths, crossovers and landscaping through to titled lots.
Yes. Earthworks, roads, drainage and every underground service are delivered by one contractor, which is how Whitby Stage 3A and the Lot 40 and Lot 300 Verna Court subdivision were run. It keeps the program tight and the accountability in one place.
From a 46-lot residential subdivision at Verna Court in Cockburn Central through to the Belmont Park Redevelopment, a multi-stage transit-oriented precinct beside Optus Stadium that took 150,000 tonnes of imported fill, 18,000m² of internal roadworks and 1.7km of drainage.
Developers, land owners and the consulting engineers acting for them. Recent works include Golden Group at Belmont Park and Whitby, Pritchard Francis on behalf of Rockingham Park at Harrington Waters, and Peritas on behalf of MGP Property at Verna Court.
Send the scope and we'll come back with the right team, the right methodology and a straight answer on program and price.
Ground Floor, 91 Havelock Street
West Perth WA 6005
Get the Civcon capability statement: our civil construction, utility infrastructure and project management credentials, ready for your next tender or project.
By sending, you agree to our privacy policy. No spam, ever.