Installation of approximately 3km of DN500 water distribution main and associated infrastructure in Ellenbrook for the Water Corporation.

Client
Water Corporation
Location
Ellenbrook WA
Status
Completed 2022
The project

Project overview

Civcon were appointed by the Water Corporation to undertake this contract which includes the installation of a new water distribution main and associated infrastructure within in Ellenbrook. The works were predominantly located on Lord Street and Park Street, and the scope included the manufacture, supply, construction, installation, testing, and commissioning of water infrastructure assets, as well as the restoration of excavated and disturbed facilities.

Construction of Ellenbrook DN500 Distribution Main
Scope of works

Scope of works

  • Establishment and control of survey marks and all survey and setting out work
  • Verification of the integrity of all existing infrastructure connection work
  • Commissioning Plan to identify and schedule all Verification, Pre-commissioning and Commissioning work activities and associated documentation
  • Excavation of pipe trenches and associated earthworks associated
  • Supply and installation of approximately 2950 metres of DN500 MSCL pipe and approximately 30 metres of DN400 MSCL pipe
  • Supply and installation of valves, and associated fittings and pits
  • Supply and installation of approximately 35 metres of DN300 MSCL pipe, DI pipe fittings and MSCL pipe fittings
  • Management of Acid Sulphate Soils and Dewatering
  • Pre-commissioning, including associated activity schedules, test reports and a consolidated summary report that details all pre-commissioning work activities and outcomes
  • Pipeline pressure testing and disinfection
  • Site restoration, reinstatement and disposal of surplus excavated material
Start your project

Building something like this?

Send the scope and we'll come back with the right team, the right methodology and a straight answer on program and price.

Call the office08 6500 1388
Head office

Ground Floor, 91 Havelock Street
West Perth WA 6005

Call 6500 1388Start your project
×
Capability statement

The full Civcon capability, in your inbox

Get the Civcon capability statement: our civil construction, utility infrastructure and project management credentials, ready for your next tender or project.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

By sending, you agree to our privacy policy. No spam, ever.