Malaga Bus Depot D&C Stage 2
Home / Projects

Malaga Bus Depot D&C Stage 2

Design, installation and commissioning of new 22kV HV infrastructure enabling around 60 DC chargers for 100+ electric buses at Malaga Bus Depot.

Client
Programmed Facility Management
Location
Malaga WA
Status
Completed 2025
The project

Project overview

The works include the design, installation and commissioning of new 22 kV HV electrical infrastructure, including four 1 MVA substations connected via a 22 kV HV ring main, inclusive of LV main switchboards and associated infrastructure, together with the construction of new substation enclosures and transformer locations, including retaining walls, communications infrastructure and other service enclosures as required. The works facilitate the installation of approximately 60 DC charging stations capable of servicing around 100+ new electric buses.

Malaga Bus Depot D&C Stage 2
Scope of works

Scope of works

  • Demolition works
  • Directional drilling
  • Earthworks
  • Retaining wall installation
  • Garrison fencing installation
  • Trenching
  • Underground pits
  • Charging station installation
  • Switchboard installation
  • Conduit installation
  • Hard and soft landscaping
  • Installation of new LED light and light poles
  • Bollard installation
  • Service relocation
  • Asphalt works
Start your project

Building something like this?

Send the scope and we'll come back with the right team, the right methodology and a straight answer on program and price.

Call the office08 6500 1388
Head office

Ground Floor, 91 Havelock Street
West Perth WA 6005

Call 6500 1388Start your project
×
Capability statement

The full Civcon capability, in your inbox

Get the Civcon capability statement: our civil construction, utility infrastructure and project management credentials, ready for your next tender or project.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

By sending, you agree to our privacy policy. No spam, ever.